Electrical furnace control panel
Pouring pit and wheeled ladle
Integrated refining and vacuum-degassing (VD) furnace
Casting pit
  PROGRESSIVE EVOLUTION
 

In 1995, a second ladle furnace and an automatic ferroalloy loading system were installed alongside the existing plant.

At the beginning of 2002, a new electric arc furnace with a variable capacity of between 30 and 50 tons replaced the existing unit and, shortly thereafter, was complemented by a second, more modern vacuum-degassing system.

The growing demand for more sophisticated and high alloy steels led to an increase in the number and technology of the heat-treatment furnaces (both annealing and controlled cooling).

A third ladle furnace with vacuum-degassing system was installed in 2007.

In 2007 a VAR (Vacuum Arc Remelting) plant was installed as well.

Our intention to focus more and more on alloy steels, brought us to set up our induction furnace on September 2008.